CO 141 Northbound / Southbound Northwest of Dove Creek (Milemarker 2-7.3) (through May 2013) Road Maintenance Operations

Road Work ; 8:00 AM-4:30 PM MO-FR There will be one lane alternating traffic for asphalt patching. Delays possible.

CO 141 Northbound / Southbound Near Nucla (Milemarker 89-95) (through April 2013) Road Maintenance Operations

Road Work ; 8:00 AM-4:30 PM MO-FR There will be one lane alternating traffic possible for ditch cleaning. No work on TH. Delays possible.

CO 141 Northbound / Southbound Between Egnar and Slick Rock (Milemarker 9-26) (through May 2013) Paving Operations

Road Work ; 8:00 AM-4:30 PM MO-FR There will be one lane alternating traffic for bridge and roadway cleaning operations. Delays minor.

CO 141 Northbound / Southbound Near Egnar (Milemarker 12-13) (through April 2013) Paving Operations

Road Work ; 8:00 AM-4:30 PM MO-FR There will be one lane alternating traffic for paving operations. 20 minute delays possible.

CO 13 Northbound / Southbound North of 14 Mile Creek South of Meeker (Milemarker 38) (through October 2013) Road Construction

Road Work ; 7:00 AM-5:00 PM MO-FR Single lane closures possible for fence installation and culvert work. Delays possible.

US 50 Eastbound / Westbound East of La Junta (Milemarker 381-387) (through July 2013) Road Construction

Road Work ; 7:00 AM-7:00 PM MO-FR Single lane open in each direction where US 50 is 4 lanes and one-lane alternating traffic where is it 2 lanes for resurfacing. 15 minute delays possible at 1-lane alternating location at east end of project. 12 ft …

US 50 Eastbound / Westbound East of La Junta (Milemarker 381-387) (through June 2013) Road Construction

Road Work ; 7:00 AM-7:00 PM TU-FR Single lane open in each direction where US 50 is 4 lanes and one-lane alternating traffic where it is only 2 lanes for resurfacing. 15 minute delays possible at 1-lane alternating location at east end of project. 1…

CO 128 Eastbound / Westbound Interlocken Loop Between Eldorado Blvd. and 120th Avenue/CO 128 (Milemarker 6) (through July 2013) Road Construction

Road Work ; 24 Hours- All lanes closed for roadway reconstruction from 4/1/13 through 7/1/13. Traffic will be detoured to Network Parkway to Eldorado and then to Interlocken Blvd. .

CO 138 Eastbound / Westbound Between Sterling and Crook (Milemarker 18.89-43.4) (through April 2013) Road Maintenance Operations

Road Work ; 8:00 AM-4:30 PM MO-FR There will be one lane alternating traffic for asphalt patching at various locations. Delays possible. Speed limit reduced to 40 mph through work zone.

US 550 Northbound / Southbound between Molas Divide & Ouray (Milemarker 75-96) (through June 2013) Road Maintenance Operations

Road Work ; 8:00 AM-4:30 PM TU-FR There will be one lane alternating traffic for crack sealing operations. Delays possible.