I-25 Northbound at 88th Avenue (Milemarker 220) (through May 2013) Emergency Maintenance

Road Work ; 9:00 PM-5:30 AM SU and MO Single lane closed northbound I-25 at 9p with a second lane closing at midnight for emergency bridge girder painting. Delays possible.

I-25 Northbound at 88th Avenue (Milemarker 220) (through April 2013) Emergency Maintenance

Road Work ; 11:00 PM-10:00 AM FR, 9:00 PM-5:30 AM SU-TH Single lane closed northbound I-25 at 9p with a second lane closing at midnight for emergency bridge girder repair. Single lane closure FR at 11p with a second lane closing at midnight.

I-25 Northbound / Southbound Frontage Road at the Berthoud Exit (Milemarker 250) (through June 2013) Road Construction

Road Work ; 7:00 AM-5:00 PM MO-FR Possible lane closures for bridge construction. Delays possible.

I-25 Northbound / Southbound at US 50/CO 47 in Pueblo (Milemarker 100) (through October 2013) Road Construction

Road Work ; 6:00 PM-6:00 AM MO-FR Intersection closures on US 50 from Elizabeth to Wills for crosswalk painting. Single lane closures on US 50 in both directions between I-25 and Wills for final striping. Delays possible.

I-25 Northbound / Southbound at US 50/CO 47 in Pueblo (Milemarker 100) (through July 2013) Road Construction

Road Work ; 7:00 AM-5:00 PM MO-SA Possible lane closures between Baltimore and Wills for lighting, sprinkler system work, and landscaping. Minimal delays.

I-25 Northbound Between Johnstown and the Wyoming State Line (Milemarker 257-290) (through July 2013) Road Construction

Road Work ; 6:00 AM-5:00 PM TH Median work at milepost 258 (just north of US 34/Loveland exit) for guardrail repairs. No lane closures will be in effect. Speed limit reduced through work zone.

I-25 Northbound / Southbound Between Colfax Avenue and 23rd Avenue (Milemarker 210-211) (through September 2013) Road Construction

Road Work ; 24 Hours The bike path on the west side of the Platte River from Invesco Field to 15th Avenue is closed for the duration of the project. The east side is open.

I-25 Northbound / Southbound Between Colfax Avenue and 23rd Avenue (Milemarker 210-211) (through August 2013) Road Construction

Road Work ; 7:00 PM-5:00 AM SU-TH Lane closures as needed: Single lane closures NB & SB I-25 at 7p with a second lane closing at 9p and a third lane at 11p for signing and striping. Delays possible.
24 Hours The bike path on the west side of the Platte River from Invesco Field to 15th Avenue is closed for the duration of the project. The east side is open.

I-25 Northbound From Woodmen Road to Monument (Milemarker 149-161) (through December 2013) Road Construction

Road Work ; 7:00 AM-5:00 PM MO-FR, 9:00 PM-5:30 AM MO-TH, 10:00 PM-5:30 AM SU Nighttime: Single lane closures in each direction for roadway reconstruction. Daytime: Possible lane closures on ramps for ramp construction. Most daytime work behind barri…

I-76 Eastbound / Westbound Between Proctor and Sedgwick (Milemarker 145-165) (through May 2013) Road Maintenance Operations

Road Work ; 8:00 AM-4:30 PM MO-FR Single lane closures for asphalt patching, guardrail and bridge work. Speed limit reduced to 55 mph through the work zone. Delays possible.